VRIO Analysis of PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD

Posted by Sabrina Warren on Feb-27-2023

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is exposed to, as well as has ownership of different resources. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD uses these resources for meeting its goals, as well as for developing and expanding different growth opportunities. The VRIO analysis is used by the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD for assessing and evaluating these resources to help leadership and management to identify different strengths and weaknesses, and work towards using the same to enhance the business standing and proposition (Knott, 2015).

help_banner_here

VRIO importance

More importantly, the VRIO analysis is used by the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to evaluate and identify the different competitive advantages that different resources can offer. In doing so, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is able to identify resources that offer a long-term sustainable competitive advantage, and work towards building the same for increased opportunities (Chatzoglou, Chatzoudes, Sarigiannidis, & Theriou, 2018). PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD VRIO analysis is a strategic tool that allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to identify resources that offer a temporary competitive advantage – allowing the company to strategize tactics to then turn these into factors of long-term competitiveness.

The VRIO analysis largely assesses resources as being Valuable, rare, inimitable, and organized.

VRIO Framework EXPLAINED with EXAMPLES | B2U

google_add_here

Valuable

Resources are valuable if they allow the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to enhance its efficiency and effectiveness through facilitating strategy implementation and realization. Moreover, resources are also valuable if they allow the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to successfully manage the threats it is exposed to, and capitalize on different opportunities through helping build internal strengths, and manage weaknesses appropriately (Lasserre, 2017). Some examples of valuable resources for PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD include the following:

Strong global presence

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has a presence across various international locations and countries. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has expanded its manufacturing operations across different countries in Asia and Europe. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD uses these manufacturing sites as central supply locations and hubs for different regions as well (Abratt & Bendixen, 2018).

Branch network

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has a strong branch and store network across different regions in various international locations – including the UK, USA, China, and Australia, and across Europe. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has developed its store network in locations that offer the company high visibility, and promise a high customer footfall (Baines, Fill, & Rosengren, 2017).

Supply chain management

Owing to the global presence, and international operations, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD also has an internally managed supply chain network. The supply chain network ensures consistently high quality, and timely manufacture and delivery of the products offered by the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to retailers, distributors, as well as end consumers (Chernev, 2018).

Risk management

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has developed an internal means and system for identifying, managing, and mitigating environmental risks and threats. These risks include fluctuation in prices of raw materials, as well as political instability in regions where it operates. The internal risk management system for PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD comprises of continuous observation of the environment, and development of proactive strategies, as well as training of its personnel for responding to the same (Deepak & Jeyakumar, 2019).

Technological advancement

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD makes use of technological advancement for achieving economies of scale. The presence across various global locations has allowed the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to develop a seamless technological infrastructure for knowledge sharing. PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is also able to implement processes of improvement internally (Iacobucci, 2021).

google_add_here

Use of AI

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD also makes use of AI for improving internal efficiencies and processes as well as for improving the consumer experience. The use of AI internally has allowed the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to reduce the error rates, and improve logistic management, for example.

User experience

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD focuses on enhancing the user experience for maintaining loyalty. The use of AI especially has allowed the company to improve the user experience through providing 24/7 customer support, as well as developing relevant purchase prompts for consumers based on their browsing histories (Sahaf, 2019).

Customer service

The customer service offered by PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is an important and valuable resource that helps the company differentiate its offerings from that of the competition. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD offers 24/7 online support to consumers, and has a team of trained personnel for providing customer services on physical locations (Gillespie & Swan, 2021).

Research and development

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD makes a substantial investment in research and development. The research and development allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to stay updated with the market and consumer trends – thereby allowing the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to tailor its offerings and marketing efforts accordingly. The research and development also allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to improve its production processes, and improve efficiency levels continuously (Grewal & Levy, 2021).

Product offering

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD focuses on maintaining consistent quality for its product offerings. Moreover, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD also ensures that the product offerings meet the consumer needs and demands. For this purpose, it engages in the localization of its product offerings across different regions and locations (Abratt & Bendixen, 2018).

Financial resources

The financial resources and capability at the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD allows minimum dependence on debt. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has a higher dependence on equity for expansion and development purposes. This ensures lower vulnerability of the company, and gives the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD increased freedom and independence for pursuing business objectives and goals (Groucutt & Hopkins, 2015).

Marketing activities

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD engages in marketing activities for appealing to its target audience across different countries and regions. The marketing communication is tailored to take into account different cultural considerations across these locations and regions. Moreover, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD ensures to appeal to the functional as well as emotional fronts of the consumers - using insights from its research and development activities (Kotler & Keller, 2021).

Rare

Rare resources for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD are those which are not easily and readily available for the competing players. These resources are rare for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD because of the firm’s unique position and access to the resources – which is otherwise difficult and challenging to acquire. This makes rare resources cost-intensive for other organizations (Phillips & Moutinho, 2018).

Manufacturing and distribution licenses

PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has gained special licensing permissions for manufacturing and distribution in various regions ad countries – some of which are more remote and stringent towards international firms. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has been able to do so based on its strong team of lawyers and policy interpreters, as well as because of the goodwill it has developed over the years (Kotler & Keller, 2021).

Access to raw materials

PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has access to different raw materials that support its quality maintenance of product offerings. The access to raw materials for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is largely based on the company’s unique position and its investments in research and development. Both of these have allowed the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to substantially develop its capabilities (Buchanan & Huczynski, 2019).

Equipment

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has access to world-class equipment. This equipment and technology is not readily and easily available to its competing players. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has access to this equipment for increasing efficiency, and improving economies of scale based on its vast operations, and partnerships with various regional governments (McShane & Glinow, 2017).

Intellectual property

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has multiple policies regarding intellectual property, and thoroughly implements policies and regulations regarding the same internally. In addition, the company also follows external regulations for intellectual property protection. This allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to sustain its creativity and successfully continue to experiment with new product ideas (Chernev, 2018).

google_add_here

Patents

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has different patents registered under its name. This is done by the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to safeguard its innovative capacities, and maintain regulated intellectual property rights. This helps the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD stay ahead of the competition, and secure new technology and ideas to maintain the first mover, and unique competitive advantage over other players (Wunder, 2019).

Sustainable manufacturing

Based on its unique environment for development and innovation, as well as because of its engagement with advanced technology and equipment, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has developed processes for successful sustainable manufacturing. This resource allows the company to appeal to green consumers, and at the same time, maintain higher internal efficiencies and profitability (Tonelli & Cristoni, 2018).

Eco-packaging

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is also successfully engaging with, and producing eco-based packaging. This resource is important for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD, and allows it to improve its processes as well as brand perception. Competing players do not have access to the needed intellectual property, ideas, or machines to successfully, and efficiently apply this to their internal business processes and offerings (Tonelli & Cristoni, 2018).

Inimitable

Inimitable resources for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD are those which are hard and costly to copy and imitate by other players, and competitive rivals in the industry. Inimitable resources offer a long-term competitive advantage to PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD. PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has different resources that are hard to imitate, or are perfectly inimitable largely because of factors of historical context; and unique historical conditions; causal ambiguity, and/or social complexity (Stead & Stead, 2014).

For PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD, a number of resources are inimitable because of their uniqueness to the company itself. These include:

order_banner_here

Organizational culture

The organizational culture is unique to the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD – developed through the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD’s core values and beliefs, as well as its structure and managing style. The culture of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD leads to improved employee performance, and facilitates organizational success (Abbas, 2017).

HRM policies and activities

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has also built a strong HRM department internally which supports the business, and its strategies. This support is extended through various HRM functions such as hiring, and training activities and opportunities. These activities are aligned with the business goals and strategic direction for ensuring high organizational performance, and the right talent match for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD (Mariappanadar, 2019).

Compensation Framework

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD also has a unique compensation system to support internal activities and functions. The compensation system is rooted in employee motivation and needs. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD invests in understanding the needs of the employees, and then designs rewards accordingly- linking them with the job responsibilities and tasks (Mariappanadar, 2019; DuBrin, 2013).

Brand equity

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has developed strong brand equity over time. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has successfully, and continually delivered on its brand promise by providing high quality offerings. This has allowed the buildup of consumer trust as well as positive brand perception leading to higher brand equity for PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD (Kotler & Keller, 2021).

Brand loyalty

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has a high brand loyalty. Based on its offerings, quick customer service, and after-sales service, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has developed a high brand loyalty amongst customers. These customers conduct repeat purchases of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD’s offerings and products because of higher satisfaction levels (Baines, Fill, & Rosengren, 2017).

Brand awareness

The marketing activities of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD are carefully tailored and targeted, and based on the emotional appeal that the company provides in its offerings to the customers. This in turn leads to a positive buzz. The viral buzz, as well as positive marketing efforts, have led to high brand awareness for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD amongst not only its own target customers, but also amongst secondary groups (Sahaf, 2019).

Goodwill

PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has continually delivered on its promise, and has thus developed a positive brand perception. As a result of this, the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has built positive goodwill over the years. This goodwill allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to confidently launch new products in the market that consumers readily accept and consume (Grewal & Levy, 2021).

Innovation

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD continually engages in innovation and creativity as well. The company has a team for business development that engages in the process of new product design and development. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD also invests in the creative development of its employees for facilitating and encouraging new idea generation, and emphasizes on employee empowerment for the same purpose (McShane & Glinow, 2017).

google_add_here

Organizational leadership

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD has a supportive leadership. The leadership style at PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is participative which encourages discussion, and creates trust and a positive work environment. In addition, the leadership at PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is transparent and accessible, and works closely to improve and build the organizational culture through promoting core beliefs and values (Schein, 2010).

Employee commitment

The employees at the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD display high levels of job satisfaction. This is because the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD continually engages the employees with challenging tasks, trainings for personal and professional development, as well as motivational work responsibilities and teamwork. This results in increased levels of job satisfaction amongst employees of PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD, leading in turn to high levels of employee commitment (Mariappanadar, 2019).

Branding activities

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD invests in branding activities for building its brand as well as a positive consumer perception. These branding activities for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD involve not only the marketing communications, but also the development of a suitable marketing mix for the company. The branding activities help the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD increase brand awareness, as well as increase its reach and penetration amongst the target audience (Iacobucci, 2021).

Organized

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is able to capitalize on different opportunities based on the various resources available to it through being organized. This factor of the strategic framework evaluates and assesses how organized and structured the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is. The factor also reviews how the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is able to benefit from the various resources that are available to it towards building sustainable competitive advantage (Chatzoglou, Chatzoudes, Sarigiannidis, & Theriou, 2018; Stead & Stead, 2014). This part of the strategic framework for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD allows it to identify and examine different resources it has closely to be able to optimally benefit from them.

Physical infrastructure

One of the best ways through which the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is able to capitalize on the various internal and external opportunities is through the development of its physical infrastructure. The infrastructure of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD allows it to develop economies of scale as well as enhance its various manufacturing and operational processes (Buchanan & Huczynski, 2019).

Technological infrastructure

The technological infrastructure of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD allows it to benefit from the latest technological trends such as the inclusion of artificial intelligence and automation in its operational processes and schedules. The technological infrastructure has facilitated the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to improve its production and efficiency rates as well as reduce its errors. The technological infrastructure also led the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to benefit from potential advancements such as social media marketing and e-commerce (DuBrin, 2013).

Network support

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is able to further benefit from consuming of various resources available through the presence of a strong internal network. This network includes not only the physical and technological infrastructure but also the organizational network and alignment of operations locally and globally. This coordination and network allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to realize its strategic goals (Phillips & Moutinho, 2018).

Training and development

As the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is exposed to new resources and builds on old resources, it is important to update the skills of the employees. The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD continually invests in the training and development of its labor force. This ensures that the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD stays ahead of the competition.

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD maintains frequent internal training and development opportunities to help the growth of employees and improve their performance (Mariappanadar, 2019; Stead & Stead, 2014).

International Exposure

The growth and expansion of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD and its business along international fronts have given it considerable exposure to understand different cultural requirements and operational details. This exposure is important for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to allocate resources accordingly towards different regions and production sites; and manage them in the most efficient and effective manner possible (Kotler & Keller, 2021).

International learning

The international exposure that the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD also enables increased sharing of knowledge across borders. This knowledge sharing and knowledge development allows continuous learning internally for the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD. This learning then helps the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to work towards to the development of strategic structures within the organization as well as design more sophisticated management styles and tools to improve the management of resources (Daneshmandnia, 2019).

Organizational hierarchy

Optimization of the resources available to the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is because the organization has a flatter hierarchy which leads to easier access to the leadership and quicker decision-making processes. This enables higher employee empowerment and participation as well as leads to increased organizational commitment and responsibility (Deepak & Jeyakumar, 2019).

Supportive leadership

The leadership of the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD is largely supportive and ensures the development of the management team and the employees. The support of the leadership within the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD allows space for quicker decisions as well as makes room for capitalizing on the opportunities and mitigating risks accordingly. This in turn allows for improved Resource management and optimization (Schein, 2010).

Effective change management processes

The PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD engages all employees in the change management process and ensures that there is transparent communication regarding the need as well as the implementation of the same. This allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to manage resources more effectively as well as build on other resources to help the company achieve its strategic and business objectives and goals (Pollack & Pollack, 2015).

google_add_here

Conclusion

The VRIO assessment is an important strategic tool that allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to identify various resources which can lead to different forms of competitive advantages. The VRIO assessment and model allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to identify resources that can be used for developing sustainable competitive advantage over the long term as well as allows the PRODUCTION PLANNING AT VIKTOR LENAC SHIPYARD to invest in, and build other resources for the same purpose.

In addition, the strategic tool allows managers of the company to identify resources which can lead to competitive disadvantage. As such the VRIO assessment is an important source of resource evaluation as well as identification of the same.

order_banner_here

References:

Abbas, M. (2017). The effect of organizational culture and leadership style towards employee engagement and their impact towards employee loyalty. Asian Journal of Technology and Management Research (AJTMR) ISSN, 2249, 0892.

Abratt, R., & Bendixen, M. (2018). Strategic marketing: Concepts and cases. . New York, United States: Routledge.

Baines, P., Fill, C., & Rosengren, S. (2017). Marketing. New York, United States: Oxford University Press.

Buchanan, D., & Huczynski, A. (2019). Organizational behaviour. London: Pearson UK.

Chatzoglou, P., Chatzoudes, D., Sarigiannidis, L., & Theriou, G. (2018). The role of firm-specific factors in the strategy-performance relationship: Revisiting the resource-based view of the firm and the VRIO framework. Management Research Review.

Chernev, A. (2018). Strategic marketing management. Berlin/Heidelberg, Germany: Cerebellum Press.

Daneshmandnia, A. (2019). The influence of organizational culture on information governance effectiveness. Records Management Journal.

Deepak, R., & Jeyakumar, S. (2019). Marketing management. New Delhi, India: Educreation Publishing.

DuBrin, A. (2013). Fundamentals of organizational behavior: An applied perspective. Amsterdam, Netherlands: Elsevier.

Gillespie, K., & Swan, K. (2021). Global marketing. New York, United States: Routledge.

Grewal, D., & Levy, M. (2021). M: marketing. New York, United States: McGraw-Hill Education.

Groucutt, J., & Hopkins, C. (2015). Marketing. London: Macmillan International Higher Education.

Iacobucci, D. (2021). Marketing management. Boston, Massachusetts, United States: Cengage Learning.

Knott, P. (2015). Does VRIO help managers evaluate a firm’s resources?. Management Decision.

Kotler, P., & Keller, K. (2021). Marketing Management (15th global edition). London, United Kingdom: Pearson Education Limited.

Lasserre, P. (2017). Global strategic management. London: Macmillan International Higher Education.

Mariappanadar, S. (2019). Sustainable human resource management: Strategies, practices and challenges. Macmillan International Higher Education.

McShane, S., & Glinow, M. (2017). Organizational behavior. New York, United States: McGraw-Hill Education.

Phillips, P., & Moutinho, L. (2018). Contemporary issues in strategic management. London: Routledge.

Pollack, J., & Pollack, R. (2015). Using Kotter’s eight stage process to manage an organisational change program: Presentation and practice. Systemic practice and action research, 28(1), 51-66.

Sahaf, A. (2019). Strategic marketing: Making decisions for strategic advantage. New Delhi, India: PHI Learning Pvt. Ltd..

Schein, E. (2010). Organizational culture and leadership . John Wiley & Sons.

Stead, J., & Stead, W. (2014). Sustainable strategic management. . London: Routledge.

Tonelli, M., & Cristoni, N. (2018). Strategic management and the circular economy. London: Routledge.

Wunder, T. (2019). Rethinking strategic management: Sustainable strategizing for positive impact. Berlin: Springer Nature.

Students

9416 Students

can’t be wrong
order
2084621

Orders

order
4.9/5

Orders

order
1440

Ph.D Experts

Latest Feedback

Calculate the Price of Your Order

(Approximately - 0.0 Pages)

Total Price

$0

Be a great writer or hire a greater one!

Academic writing has no room for errors and mistakes. If you have BIG dreams to score BIG, think out of the box and hire EssayPandas with BIG enough reputation.

Be a great writer or hire a greater one
Order Now

Our Guarantees

  • Quality assured
  • Proof of no plagiarism
  • Qualified writers
  • Data security
  • 24/7 support
  • On time delivery
Interesting Fact

Interesting Fact

Most recent surveys suggest that around 76 % students try professional academic writing services at least once in their lifetime!

Order Now
whatsapp chatbox

Hi there !

We are here to help. Chat with us on WhatsApp for any queries.

whatsapp chat close